Lesson 4 of 4The Benefits of a Venture Plan
Unit 3 · Lesson 4 of 4

Evaluating and Revising the Plan

A good venture plan is flexible, ethical and adaptable: owners forecast what could change, run what-if scenarios with real numbers, ask community members to test the plan, and use a thorough plan to cut start-up costs and financial risk.

5 min read10 practice questionsInteractiveAsk AI about this →

Key things to remember

  1. 1A venture plan should be flexible (has options), ethical (honest forecasts, disclosed risks, promises kept) and adaptable (reviewed and rewritten as facts change).
  2. 2Conditions that may force a revision: a new competitor, cost increases, a supplier failing, a recession, regulation changes, and lower-than-expected sales.
  3. 3Profit = units × (price − variable cost) − fixed costs. Break-even units = fixed costs ÷ (price − variable cost), rounded up.
  4. 4Because fixed costs do not shrink, a percentage drop in sales causes a larger percentage drop in profit.
  5. 5Community members (entrepreneurs, bankers, advisers, friends and family, customers, suppliers) test the plan from outside and point to sections that need revising.
  6. 6A thorough plan lowers start-up costs, the amount borrowed and the break-even point, which reduces financial risk.

A venture plan is a forecast, and forecasts are like weather reports: useful, but never perfect. In June, a new shop might start offering home tune-ups, a heat wave might keep cyclists indoors, or the price of brake cables might jump. Owners who treat the plan as finished are caught off guard. Owners who expect change and plan for it can react in days instead of weeks. This lesson shows how Maya and Jordan test their plan against what could go wrong, put numbers on each possibility, and use other people's eyes to make the plan stronger.

Flexible, ethical and adaptable

  • Flexible: the plan includes options, not just one path. Ride Ready lists in advance what it will do if sales fall short: add flat-tire repairs, offer a two-bike family price, or cut the phone plan.
  • Ethical: the forecasts are honest, risks are disclosed, and promises to lenders, suppliers and customers are kept even when plans change. If Ride Ready's sales fall, it tells Jordan's parents early about any delay in repaying the loan instead of hiding it.
  • Adaptable: the owners review the plan regularly, compare results with the goals, and rewrite sections when the facts change. A plan that is never updated stops being a road map and becomes a souvenir.
VideoWatch how real ventures tested a simple version, listened to feedback and changed direction, which is the same flexibility a good plan needs.Watch on YouTube

Forecasting conditions that would force a revision

ConditionEarly warning signHow it hits Ride ReadyPossible revision
A new competitorA shop advertises home tune-upsPressure to cut the priceStress speed and service, or bundle a free safety check
Cost increasesSupplier sends a new price listParts cost more per tune-upRaise the price slightly or find a cheaper supplier
A supplier failingLate or missing deliveriesNo parts, so jobs are cancelledLine up a second supplier in advance
A recessionLayoffs and falling consumer spending in the newsFewer people pay for repairsOffer lower-priced basic checks; cut fixed costs
Regulation changesThe municipality announces a new licence or ruleA new fee raises fixed costsAdd the fee to the budget and recheck break-even
Lower-than-expected salesBookings behind the weekly targetLess revenue to cover fixed costsIncrease promotion, add services, revise the forecast
Conditions that may require a venture plan to be revised, with warning signs and possible responses.

What-if scenarios with real numbers

A what-if scenario changes one assumption in the plan and recalculates the result. Ride Ready's base plan is 60 tune-ups at $50, with $10 of parts per tune-up and $1,600 of start-up and fixed costs. Each tune-up contributes $50 − $10 = $40 toward the fixed costs, so the base profit is , and the break-even point is tune-ups.

ScenarioTune-upsPriceParts eachFixed costsProfit
Base plan60$50$10$1,600$800
Sales drop 20%48$50$10$1,600$320
Parts rise to $1460$50$14$1,600$560
New competitor: price cut to $4560$45$10$1,600$500
Recession: sales drop 30%42$50$10$1,600$80
New $120 licence fee60$50$10$1,720$680
Profit = tune-ups × (price − parts) − fixed costs. Every scenario still makes a profit, but the recession leaves almost no cushion.
Why a 20% drop in sales cut profit by 60%
Sales fell from 60 to 48 tune-ups, a 20% drop, but profit fell from $800 to $320, a drop of $480, which is 60% of the original profit. The reason is that the $1,600 of fixed costs does not shrink when sales do. Every lost tune-up removes its full $40 contribution straight from profit. This is why owners test the sales forecast more carefully than any other number.
Loading interactive…
Set a $50 price, a $10 variable cost and fixed costs of $1,600, then drag expected units from 60 down to 50 and 40 and watch profit shrink faster than sales. At 40 tune-ups profit is exactly $0.

Getting community members to test the plan

The owners are the people least able to spot the weak points in their own plan, because they wrote it and want it to work. Community members bring outside eyes. Experienced entrepreneurs know which costs beginners forget and how long sales take to build. Bankers and loans officers test whether the cash flow can really repay a loan. Advisers at a Small Business Enterprise Centre know local licences and programs. Friends and family can act as test customers and give honest reactions, though they may be too kind to criticize, so their praise should not replace real market research. Potential customers and suppliers can confirm whether the price and the order sizes are realistic. Each piece of feedback becomes a reason to revise a section, and the problem-solving cycle below gives a method for acting on it.

1. Define the problemorders arrive 3 days late2. Research causessupplier delays, slow packing3. Generate solutionsnew supplier, batch packing4. Choose a solutionweigh cost, time and effect5. Implement itpack in batches each evening6. Evaluateare orders on time now?Example problem:late online ordersNot solved?loop back to step 1
Fig 1Revising a plan follows the problem-solving cycle: define the problem, research causes, generate and choose a solution, implement it, then check whether it worked.

How a thorough plan cuts start-up costs and risk

Start-up itemFirst draft (before research)Researched plan
Tools and repair stand$1,150 (all new)$750 (used, from a retiring mechanic)
Bike trailer$600 (new)$300 (used, online)
Liability insurance$250$250
Website and flyers$400 (paid designer)$200 (free site builder, printed flyers)
Total start-up cost$2,400$1,500
Research and price quotes cut Ride Ready's start-up cost by $900.

Writing the plan forced Maya and Jordan to get quotes, and the quotes saved $900. That saving does more than keep cash in their pockets. With the first draft, fixed costs would have been $2,400 + $100 = $2,500, so the break-even point would have been , or 63 tune-ups, more than the 60 they expect to sell. The draft plan would have lost money even if every forecast came true. The researched plan breaks even at 40 tune-ups, needs only a $300 loan, and leaves a cushion of 20 tune-ups if sales disappoint. A thorough, accurate plan lowers start-up costs, shrinks the amount that must be borrowed, and reduces the chance that one bad month sinks the business.

Worked examples

Reveal one step at a time and try to beat it to the next line.

Example 1
What if Ride Ready's sales are 20% lower than forecast? The base plan is 60 tune-ups at $50, $10 of parts each, and $1,600 of fixed costs. Find the new profit and the percentage change in profit.
Example 2
Ride Ready's supplier raises the cost of parts from $10 to $14 per tune-up. Find the new break-even point and decide whether the plan still works at 60 tune-ups.
Example 3
Ride Ready's first-draft start-up list cost $2,400, and the researched list costs $1,500. With a $100 phone plan added to either, compare the break-even points and explain how the thorough plan reduced risk.

Where marks get lost

  • Treating the plan as finished once it is written, instead of comparing actual results with the goals every week or two and revising.
  • Assuming a 20% drop in sales means a 20% drop in profit. Fixed costs stay the same, so profit falls by a much larger percentage.
  • Rounding break-even down (44 instead of 45 tune-ups). Selling 44 still leaves a small loss, so always round up.
  • Changing the forecast to make the numbers look better without any new evidence. That is wishful thinking, not revision, and showing it to lenders is unethical.
  • Counting praise from friends and family as market research. They may be too kind to criticize; real customers and experienced advisers give more reliable feedback.

Flashcards 8

Flexible plan
Ethical plan
Adaptable plan
What-if scenario
+ 4 more

Practice

1
Ride Ready's sales come in 25% below the forecast of 60 tune-ups. With a $50 price, $10 of parts per tune-up and $1,600 of fixed costs, what is the profit, in dollars?
$
2
If parts rise to $15 per tune-up (price $50, fixed costs $1,600), how many tune-ups must Ride Ready complete to break even? Answer with a whole number.
3
A venture's forecast profit was $1,000. After a cost increase, the revised profit is $650. What is the percentage change in profit? Use a negative number for a decrease.
%
4
Match each condition to a sensible revision of Ride Ready's plan.
A supplier stops delivering
A shop starts offering home tune-ups
A new municipal licence fee
Bookings fall behind the weekly target
5
Ride Ready's sales are lower than forecast, and it will be two weeks late repaying Jordan's parents. What is the ethical response?
6
Why did a 20% drop in Ride Ready's sales cause a 60% drop in profit?
7
Why should friends and family not be the only people who review a venture plan?
8
Research lowers a venture's start-up cost from $2,400 to $1,500. By what percentage did the start-up cost fall? Give your answer to one decimal place.
%
9
How does a thorough, accurate venture plan reduce financial risk?
10
Put the steps for revising a plan after a problem appears in the order of the problem-solving cycle.
  1. 1Implement the solution
  2. 2Choose a solution by weighing cost, time and effect
  3. 3Check whether it worked, and loop back if not
  4. 4Define the problem (bookings are behind target)
  5. 5Research the causes
  6. 6Generate possible solutions